Friday, May 30, 2008

House update!




Well things are moving but very very slow. I am getting really sick of waiting for it to be finished. Here are some things that need to be finished still - painting the inside and outside, the stone, driveway, countertops, lighting, and finish plumbing. Tyson and Nick did a great job on installing all the bamboo flooring. Which was about 2000sqft, we put it in most of the house. Here are some photos of the fireplace which turned out great and my master bath which i love. The tile in the bath is silver travertine looks more like a marble though.

No comments: